AMERICAN-BUILT POWER DISTRIBUTIONSAN ANTONIO & SOUTH TEXAS / NATIONWIDE SHIPPING

ENGINEERED FOR YOUR PROJECT

Electrical switchgear, built for what’s next.

New, American-built power distribution equipment. Custom engineered, built to spec, and shipped wherever the job takes you.

DIRECT FROM THE MANUFACTURER / NEW EQUIPMENT

Gray electrical switchgear cabinets with open doors on wooden pallets.
01 / POWER DISTRIBUTIONBUILT FOR THE JOB
Representative switchgear photography.
✦MADE IN THE USAAmerican components
▦UL 891Switchboards when specified
↗BUILT TO SPECProject-specific engineering
→NATIONWIDEShipping across the USA

THE MANUFACTURER’S PERSPECTIVE — 02

When your project calls for new electrical distribution equipment, working directly with the manufacturer can make requirements, schedules, and decisions easier to coordinate. We manufacture new switchgear for customers in San Antonio and across South Texas, and we ship nationwide. From an initial equipment list to a custom-built assembly, our focus is on practical engineering coordination and responsive lead times.

New equipment, built around your specifications

Every facility has its own electrical demands and physical constraints. Rather than starting with an assumed configuration, we work from your project specifications to develop a new equipment solution. Share the application, the intended loads, and any drawings or standards that govern the installation so the quotation reflects what you actually need.

As a direct manufacturer, we can discuss configuration questions with your project team early, when changes are easier to evaluate. American-made components are a sourcing priority, with component origin and availability confirmed during the quotation process. The result should be an equipment plan aligned with both the technical requirements and the procurement schedule.

Define the electrical requirements

A useful request identifies system voltage, phase, frequency, and the required continuous current ratings for the main and feeders. Include the service arrangement, load information, and anticipated future capacity when they are known. For a replacement, existing drawings and field measurements can help identify connections and installation constraints that a nameplate alone may not show.

Available fault current and the required short-circuit rating are equally important. Provide the available short-circuit information at the equipment location, along with protective-device preferences and coordination requirements. The design team can then review the proposed equipment ratings and protection against the project documents rather than relying on assumptions.

Plan the enclosure and equipment layout

The electrical design has to fit the space as well as the load. Tell us whether the equipment will be installed indoors or outdoors and describe the expected environmental conditions. The specified enclosure type, ventilation needs, and any exposure to moisture, dust, or corrosive conditions should be considered together.

A preliminary layout should address equipment dimensions, cable entry, feeder locations, and the access needed for operation and maintenance. Door swing, working clearances, and the route for moving the assembly into place matter too. Your design and installation teams should verify the final arrangement against site conditions and applicable requirements.

Coordinate engineering and certification

Clear communication between the owner, engineer, contractor, and manufacturer helps resolve details before fabrication. Share one-line diagrams, equipment schedules, and the relevant sections of the specification. We can review the requested configuration and coordinate drawings and outstanding questions with the project team as the design moves forward.

If the project calls for a UL 891 switchboard, identify that requirement in the request. UL 891 applies to switchboards, and any claim that a particular assembly is UL Listed must be supported by the actual certification and markings for the equipment supplied. Confirm the applicable listing and its scope before ordering; do not assume it applies to every assembly.

Keep schedules and delivery in view

We focus on short lead times, starting with a clear understanding of the required ship date and the decisions needed to reach it. Component availability, configuration, drawing review, and manufacturing capacity can all affect the schedule. Discuss priorities early so the proposed timeline is based on the specific equipment and current conditions.

We serve San Antonio and South Texas projects and can arrange shipment nationwide. Let us know the delivery destination, receiving constraints, and preferred timing during the quote process. For equipment with restricted access or special handling needs, coordinate unloading and movement with the receiving and installation teams before the shipment arrives.

What to include in your quote request

To get started, send the project location, required delivery date, one-line diagram, and equipment schedule if available. Include voltage, phase, frequency, main and feeder current ratings, available fault current, and desired protective devices. Identify any required listing, applicable specifications, enclosure conditions, and preferences for American-made components.

Also share available space, cable entry preferences, installation drawings, and the best contact for technical questions. If some details are still being developed, tell us what is known and what remains open. Electrical design, installation, testing, and maintenance must be performed by appropriately qualified people in accordance with applicable codes and project requirements.

LET'S BUILD SOMETHING RELIABLE — 03

Ready to talk
switchgear?

Tell us about the new equipment your project needs. Include as much or as little detail as you have today.

(951) 403-5738

CALL TO DISCUSS YOUR PROJECT

PROJECT INQUIRY

Request a quote

01 — 04

This opens your email app for you to review and send. Add any details that do not transfer, or call if you do not have an email app configured.

Request a quote