AMERICAN-BUILT POWER DISTRIBUTIONSAN ANTONIO & SOUTH TEXAS / NATIONWIDE SHIPPING

BUILT IN THE USA. READY FOR YOUR PROJECT.

Automatic Transfer Switches for Data Centers

An automatic transfer switch (ATS) connects a defined load to a normal or alternate power source when its control logic detects a qualifying change in source availability.

DIRECT FROM THE MANUFACTURER / NEW EQUIPMENT

Tall gray switchgear cabinets with circuit breakers and orange labels on pallets.
01 / POWER DISTRIBUTIONBUILT FOR THE JOB
Representative switchgear photography.
✦MADE IN THE USAAmerican components
▦UL 891Switchboards when specified
↗BUILT TO SPECProject-specific engineering
→NATIONWIDEShipping across the USA

THE MANUFACTURER’S PERSPECTIVE — 02

An automatic transfer switch (ATS) connects a defined load to a normal or alternate power source when its control logic detects a qualifying change in source availability. In a data center, the choice affects more than generator backup: it shapes the power paths supporting UPS systems, cooling and future capacity. Owners and engineers should define those relationships before selecting equipment or requesting a quotation.

Place transfer equipment within the power architecture

Start with a one-line diagram showing utility and generator sources, transfer points, UPS inputs, distribution feeders and critical loads. An ATS transfers a load between sources; it is not a UPS and does not itself provide stored energy during an interruption. The UPS and its battery or other energy source must cover the actual interruption and restart sequence for the loads it serves.

For an A/B design, identify which equipment is supplied by each path and whether a common transfer device would create an unwanted single point of failure. Dual-corded IT equipment does not automatically have independent power if both feeds converge upstream. Separate transfer arrangements can preserve more independence, but require additional space, protection, controls and careful coordination.

Agree on transfer behavior and source priorities

An open-transition transfer briefly disconnects the load before connecting the other source. A closed-transition arrangement can momentarily overlap sources, but requires suitable synchronization, protective measures and project-specific utility approval where applicable. Compare these options against UPS ride-through, generator capability and the consequences of a transfer failure rather than assuming a seamless changeover.

Document the conditions for source acceptance, generator start signals, stabilization delays, retransfer and generator cooldown. Include how the sequence responds if a source returns and then fails again. Generator suppliers, UPS vendors and the engineer should verify that starting, load pickup and retransfer assumptions are compatible with the entire facility, including cooling loads.

Match electrical duty and grounding

The quotation package should state system voltage, phase and wire configuration, expected load, conductor details and available fault current from each source. Specify the required transfer-switch withstand and closing rating together with the upstream protective device and clearing conditions used to establish compatibility. A continuous-current rating alone does not establish whether the assembly can withstand a particular fault.

Ask the engineer to review protective coordination across both source paths, since utility and generator fault contributions may differ. Neutral switching, grounding and bonding depend on the source arrangement and whether the generator is separately derived; these decisions affect the whole system. Apply the relevant code and equipment standards, and verify the proposed transfer equipment's project-specific listing and scope.

Make maintenance and growth part of the purchase

A bypass-isolation arrangement can provide a path around the transfer mechanism for planned maintenance, but it adds cost, footprint and operating complexity. It does not make every component serviceable without an interruption. Define the maintenance objective, actual isolation boundaries and permissible load impact, then have qualified personnel develop procedures consistent with the equipment instructions and site rules.

For planned growth, show expected load phases, spare distribution capacity and the timing of future feeders on the drawings. Reserving floor space is not equivalent to reserving electrical capacity: the sources, transfer device, conductors and upstream protection all need to support the future configuration. Compare a larger initial installation with staged additions and their potential commissioning impacts.

Coordinate physical and control interfaces

Identify cable or busway entry, conductor quantities, termination space, equipment dimensions and available working clearances. Confirm delivery access, lifting constraints, floor support and environmental conditions with the contractor. A compact arrangement may fit the room on paper yet leave inadequate space for field terminations or the maintenance access the owner expects.

Define the generator start interface, control-power source, remote indications, alarms and any building-management communications in a point list. Establish ownership of wiring, network settings and functional integration. Specify what happens on loss of control power or communications, and distinguish remote monitoring from remote control so that operating authority and cybersecurity requirements are clear.

Compare proposals and plan acceptance

As a direct American manufacturer of new power-distribution assemblies serving San Antonio, South Texas and nationwide, we can review the transfer equipment and its interfaces as part of a defined project scope. Request a clear breakdown of included devices, enclosure, controls, drawings, testing and exclusions; confirm whether the ATS is separate from or integrated with a distribution assembly.

Schedule time for source data, submittal review, component availability, fabrication and factory testing before arranging delivery and site commissioning. Agree on test scenarios, acceptance criteria and records, including simulated source changes and required alarms. The owner, engineer, installer and qualified commissioning team should assign responsibility for field tests, settings approval, energization and final documentation.

LET'S BUILD SOMETHING RELIABLE — 03

Ready to talk
switchgear?

Tell us about the new equipment your project needs. Include as much or as little detail as you have today.

(951) 403-5738

CALL TO DISCUSS YOUR PROJECT

PROJECT INQUIRY

Request a quote

01 — 04

This opens your email app for you to review and send. Add any details that do not transfer, or call if you do not have an email app configured.

Request a quote