AMERICAN-BUILT POWER DISTRIBUTIONSAN ANTONIO & SOUTH TEXAS / NATIONWIDE SHIPPING

BUILT IN THE USA. READY FOR YOUR PROJECT.

Electrical Panelboards for Airports

Airport panelboards distribute power to the circuits that keep terminals and supporting facilities operating.

DIRECT FROM THE MANUFACTURER / NEW EQUIPMENT

Row of Allen-Bradley electrical control cabinets with black handles.
01 / POWER DISTRIBUTIONBUILT FOR THE JOB
Representative switchgear photography.
✦MADE IN THE USAAmerican components
▦UL 891Switchboards when specified
↗BUILT TO SPECProject-specific engineering
→NATIONWIDEShipping across the USA

THE MANUFACTURER’S PERSPECTIVE — 02

Airport panelboards distribute power to the circuits that keep terminals and supporting facilities operating. Their selection affects far more than available breaker spaces: sources, outage boundaries, security access and future tenant changes all shape the design. Owners and specifiers should define how each panel fits the airport electrical system before asking a direct manufacturer to price a new distribution assembly.

Build a useful circuit schedule

Start with an updated one-line and panel schedules showing source, system voltage, phase and wire arrangement, calculated loads and feeder destinations. Separate lighting, receptacles, baggage systems, communications rooms and other loads according to their actual operating needs. Identify tenant circuits and which party controls their future changes, so labeling and spare capacity reflect the facility’s responsibilities.

A schedule should distinguish connected load from the engineer’s demand assumptions and planned growth. Gate renovations can change the mix of equipment without increasing every load at once. Reserve circuit positions and, where justified by the calculation, bus and feeder capacity; empty spaces alone do not prove that future load can be accommodated.

Map normal and alternate power

For each panel, identify the upstream normal source, any transfer equipment and the alternate source capacity. The design team should classify loads under applicable code and airport requirements rather than assume every important circuit belongs on the same standby system. Egress lighting, security equipment and airline functions may have different continuity and transfer requirements.

Coordinate the panel schedule with the transfer-switch sequence, generator loading, load shedding and restoration priorities. Separate distribution paths can support different operational priorities, but add equipment, space and coordination work. The engineer must also resolve source grounding and neutral interfaces for the selected transfer arrangement; the panelboard quotation should identify the connections it expects.

Match protection to the system

Provide available fault-current information at each panel location, upstream device details and the proposed branch protective devices. The assembly and its devices need suitable short-circuit and interrupting ratings for the engineered system. Where a series-rated combination is proposed, verify its documented application and acceptance rather than assuming any pair of breakers qualifies.

An engineer’s coordination study can compare device characteristics across the relevant fault-current range and identify where a branch fault might affect upstream distribution. Complete selectivity may not be achievable with every device combination. Identify circuits whose interruption has operational consequences, then review the tradeoff among coordination, protective settings, equipment cost and available panel space.

Define terminal and airfield boundaries

Terminal panels may serve spaces with tenant metering, public access limits or strict working-hour constraints. Panels serving airfield support buildings face different routing, environmental and security issues. Specify whether an enclosure is indoors or outdoors and document moisture, dust, temperature, corrosion and mounting conditions so the proposed enclosure suits its actual location.

Do not assume an ordinary building panel directly supplies runway or taxiway lighting circuits. Identify the interface to any separately engineered airfield lighting equipment, including its feeder, controls, ownership and required availability. The airport’s electrical and airfield teams should confirm circuit boundaries and any applicable aviation requirements before the design is frozen.

Fit the panel to its installation

Give the manufacturer room drawings, wall or floor mounting constraints, cable entry direction, conductor quantities and sizes, and termination preferences. Verify electrical working space and access with the responsible designer and authority having jurisdiction. A compact panel may simplify placement, while a larger cabinet can provide needed wiring room, spare positions or access for maintenance.

If monitoring is required, define whether meters, communications gateways or remote status points are included, together with protocol, network handoff and commissioning responsibility. Coordinate panel identification and circuit directories with the airport’s asset records. Confirm applicable assembly standards and any required listing for the specific proposed equipment; a general statement of compliance is not a substitute for that verification.

Procure and phase around operations

Request a quotation for a newly manufactured assembly with the one-line, schedules, fault data, enclosure requirements and installation constraints attached. Ask for a device schedule, dimensions, connection details, submittal drawings, testing scope and documented exceptions. Compare bids on the same basis, including who supplies transfer equipment, field wiring, settings, installation and commissioning.

Build the schedule around design review, component availability, drawing approval, fabrication, inspection and delivery rather than an assumed fixed lead time. The owner and contractor should coordinate outage windows with airport operations, affected tenants and other stakeholders, including any security-access approvals. Qualified electrical personnel plan and perform isolation, field connections, testing and energization under the site’s procedures; turnover should include final drawings and test records.

LET'S BUILD SOMETHING RELIABLE — 03

Ready to talk
switchgear?

Tell us about the new equipment your project needs. Include as much or as little detail as you have today.

(951) 403-5738

CALL TO DISCUSS YOUR PROJECT

PROJECT INQUIRY

Request a quote

01 — 04

This opens your email app for you to review and send. Add any details that do not transfer, or call if you do not have an email app configured.

Request a quote