AMERICAN-BUILT POWER DISTRIBUTIONSAN ANTONIO & SOUTH TEXAS / NATIONWIDE SHIPPING

BUILT IN THE USA. READY FOR YOUR PROJECT.

Metal-Clad Switchgear for Data Centers

A data center’s medium-voltage distribution must support continuous computing loads while accommodating construction, maintenance and future demand.

DIRECT FROM THE MANUFACTURER / NEW EQUIPMENT

Electrical cabinets and overhead cables lining a long industrial aisle.
01 / POWER DISTRIBUTIONBUILT FOR THE JOB
Representative switchgear photography.
✦MADE IN THE USAAmerican components
▦UL 891Switchboards when specified
↗BUILT TO SPECProject-specific engineering
→NATIONWIDEShipping across the USA

THE MANUFACTURER’S PERSPECTIVE — 02

A data center’s medium-voltage distribution must support continuous computing loads while accommodating construction, maintenance and future demand. Metal-clad switchgear can organize incoming sources and outgoing feeders into a controlled, compartmented lineup. Owners and specifiers should start with the facility’s actual operating philosophy, not just a desired equipment rating: redundant paths are useful only when their shared dependencies and maintenance boundaries are understood.

Translate availability goals into a lineup

A metal-clad design uses grounded metal barriers to separate major primary components into compartments; its particular construction and applicable standard should be confirmed in the specification and manufacturer’s submittal. Drawout circuit breakers may support maintenance planning, but compartmentation alone does not make every adjacent task safe or allow all work without an outage.

Map each utility or on-site source through the switchgear, transformers and downstream A and B distribution paths. Show common buses, control supplies and cable routes that might defeat the intended separation. An additional lineup or bus section can improve maintenance flexibility, but it also adds equipment, space, coordination work and potential common-mode interfaces.

Define source and tie operating states

For a main-tie-main arrangement, document which source normally supplies each bus section and what the facility expects when a source is unavailable. The owner, engineer and utility should agree whether sources may ever operate in parallel. Mechanical and electrical interlocks, permissives and transfer logic must reflect those decisions rather than an assumed sequence.

Check whether either remaining source can carry the intended transferred load and how upstream generators, downstream uninterruptible power supplies and cooling systems respond. Automatic transfer can shorten a disruption, but sensing, control power and failure modes need study. Define alarm, manual-control and loss-of-control-power behavior before selecting the scheme.

Match protection to every source condition

Provide nominal system voltage, grounding method, present and future load, utility fault information and contributions from generators or other sources. The engineer should evaluate equipment voltage class, continuous current, interrupting duty and short-time withstand for the credible system configurations. A bus tie may change fault levels and current paths when its operating state changes.

Specify protective relay functions, current and voltage transformer requirements, trip power and the party responsible for settings. A coordination study compares protective-device behavior across the relevant fault range; selectivity cannot be assumed merely because there are separate breakers. Request the data needed for the site’s short-circuit and arc-flash studies, and reconcile revisions before commissioning.

Plan growth without stranding capacity

Forecast rack and cooling demand by construction phase, including expected transformer and feeder additions. An installed spare breaker costs more initially than a prepared space, while a future section requires physical room and a viable extension interface. Neither option creates usable capacity if the upstream source, bus, protection or room cooling is insufficient.

Include a phased load schedule and identify which capacities must be provided now versus reserved for later. Confirm cable entrance, termination space, shipping splits and any future extension provisions on drawings. If utilization or equipment selections change, the design team should reassess ratings and approvals before adding load or a feeder.

Make metering and controls useful to operations

Choose metering locations around sources, bus sections and major feeders according to the questions the operations team needs answered: source loading, feeder trends, power quality or energy allocation. Define measured quantities, accuracy, instrument transformer ratios and data ownership. Utility revenue metering, if required, must also follow the utility’s separate interface requirements.

A building or electrical power monitoring system needs an agreed communications protocol, network boundary, point list and time synchronization approach. Specify breaker status, alarms, relay events and control authority as appropriate. Determine who supplies network connections and verifies each point; remote indications and commands should not substitute for site safety procedures.

Buy, test and maintain against the same plan

For a direct-manufacturer quotation for new equipment, send the one-line, load and fault data, physical constraints, control narratives, applicable standards and required test scope. Compare proposals for construction, ratings, exceptions, drawings and field responsibilities. Confirm project-specific compliance and listing requirements rather than applying a low-voltage switchboard standard automatically to medium-voltage metal-clad gear.

Set review milestones for submittals, component selection, factory inspection, delivery and site commissioning; approval changes and component availability can affect the schedule. Specify functional-test criteria, witnessed checks if needed, and final drawings, relay records and manuals. Qualified personnel must plan isolation, authorized outages and verification under site procedures; maintenance continuity depends on the engineered system, not compartment labels alone.

LET'S BUILD SOMETHING RELIABLE — 03

Ready to talk
switchgear?

Tell us about the new equipment your project needs. Include as much or as little detail as you have today.

(951) 403-5738

CALL TO DISCUSS YOUR PROJECT

PROJECT INQUIRY

Request a quote

01 — 04

This opens your email app for you to review and send. Add any details that do not transfer, or call if you do not have an email app configured.

Request a quote