Automatic Transfer Switches: Enclosure and Environment

An automatic transfer switch (ATS) must sense and transfer between normal and alternate power sources while its enclosure protects the equipment and remains accessible to qualified personnel.

DIRECT FROM THE MANUFACTURER / NEW EQUIPMENT

Gray electrical switchgear cabinets with open doors on wooden pallets.
01 / POWER DISTRIBUTIONBUILT FOR THE JOB
Representative switchgear photography.
✦MADE IN THE USAAmerican components
▦UL 891Switchboards when specified
↗BUILT TO SPECProject-specific engineering
→NATIONWIDEShipping across the USA

THE MANUFACTURER’S PERSPECTIVE — 02

An automatic transfer switch (ATS) must sense and transfer between normal and alternate power sources while its enclosure protects the equipment and remains accessible to qualified personnel. The right enclosure is not simply an indoor or outdoor choice: heat, moisture, conductor routing, controls and maintenance space can determine whether an assembly fits the facility and supports the intended transfer scheme.

Describe the actual exposure

Start with the proposed location and its conditions, not a preferred enclosure label. Note whether the switch will be in a conditioned electrical room, an unconditioned building or outdoors. Give the manufacturer expected ambient temperature ranges, altitude, humidity and any exposure to dust, rain, washdown, salt-laden air or process chemicals.

For example, a covered outdoor location may still experience wind-driven rain and condensation; a room near a washdown area can have moisture exposure even though it is indoors. Identify flooding potential and nearby drainage as well. The engineer can then assess the site and specify a suitable location, enclosure and foundation interface.

Match protection to the complete enclosure

Enclosure type designations describe different forms of environmental protection. An indoor general-purpose enclosure and an outdoor rain-resistant enclosure are not interchangeable, while a washdown or corrosive environment may require a different construction. Specify the applicable enclosure standard and required type, then confirm the complete proposed assembly meets the project requirements. An enclosure designation alone does not establish the switch’s electrical fault rating or arc-flash performance.

More sealing is not automatically better. Gaskets, door hardware, finish and material influence durability and maintenance, but a tightly enclosed switch also needs an adequate thermal design. Cable entries, accessories and field modifications must be compatible with the required enclosure protection; coordinate their locations and responsibility before approving drawings.

Account for heat and condensation together

The transfer mechanism, conductors and controls release heat inside the enclosure. Provide the design ambient and loading information so the manufacturer can review the proposed arrangement against component and assembly limits. If an indoor room needs additional cooling, the building designer must account for the equipment heat rejection and other room loads.

Outdoor temperature swings and humid air can produce condensation even when rain is excluded. Discuss whether a space heater, humidity control or other manufacturer-approved measure is appropriate, including its power source, controls and monitoring. Ventilation or cooling provisions must not compromise the specified environmental protection or the equipment’s approved construction.

Plan the footprint around two power sources

An ATS typically has normal-source, alternate-source and load connections, so conductor quantity and entry direction can strongly affect enclosure dimensions. Provide conductor sizes, quantities, material, termination preferences and routing constraints for each connection. The manufacturer and electrical designer can review bending space, lugs, separation and top or bottom entry before dimensions are fixed.

Allow for door swing, controller visibility, maintenance access and the working space required by applicable codes. A compact enclosure may reduce its footprint but leave fewer routing options or less convenient access. Confirm the delivery path, mounting surface, anchorage and lifting constraints with the installer and structural designer, rather than relying on a catalog outline alone.

Coordinate controls and qualified-person access

Identify generator start contacts, source-availability signals, alarms, remote indications and communications at the quotation stage. Show where control wiring enters and who supplies external interfaces. A controller display or remote monitoring point should be placed where authorized staff can obtain needed information without defeating the enclosure’s intended protection.

Because normal and alternate sources can energize the ATS, a single upstream disconnect does not necessarily address every source. Establish the isolation and maintenance approach with the facility’s qualified electrical personnel and follow site safety procedures and manufacturer instructions. Enclosure access, door interlocks and any remote functions should be reviewed as part of that plan.

Buy against a defined submittal package

Send a current one-line diagram, source characteristics, load requirements, available fault-current information and the intended transfer sequence with the environmental data. Ask the manufacturer to identify the proposed enclosure construction, applicable equipment standard and project-specific listing, plus any conditions affecting the transfer switch’s short-circuit rating and protective devices.

Request dimensional drawings, cable and control terminal details, heat-rejection information, accessory power needs, inspection or functional test scope, and installation and maintenance documentation. Assign responsibility for site preparation and field connections. Schedule drawing review before fabrication and coordinate approvals, component availability, delivery access and the owner’s commissioning window without assuming a firm delivery date.

LET'S BUILD SOMETHING RELIABLE — 03

Ready to talk
switchgear?

Tell us about the new equipment your project needs. Include as much or as little detail as you have today.

(951) 403-5738

CALL TO DISCUSS YOUR PROJECT

PROJECT INQUIRY

Request a quote

01 — 04

This opens your email app for you to review and send. Add any details that do not transfer, or call if you do not have an email app configured.

Request a quote