Metal-Clad Switchgear

Metal-clad switchgear groups medium-voltage switching and protection equipment in a compartmented assembly.

DIRECT FROM THE MANUFACTURER / NEW EQUIPMENT

Electrical switchgear beneath overhead conduits in an industrial room.
01 / POWER DISTRIBUTIONBUILT FOR THE JOB
Representative switchgear photography.
✦MADE IN THE USAAmerican components
▦UL 891Switchboards when specified
↗BUILT TO SPECProject-specific engineering
→NATIONWIDEShipping across the USA

THE MANUFACTURER’S PERSPECTIVE — 02

Metal-clad switchgear groups medium-voltage switching and protection equipment in a compartmented assembly. Choosing a lineup involves more than counting feeders: the engineer must establish electrical duty, protective functions, installation constraints and operating expectations together. For projects in San Antonio, South Texas and nationwide, a direct manufacturer can review those requirements for a new assembly before the purchasing team commits to a defined scope.

Understand what compartmentation buys

Metal-clad is a particular class of metal-enclosed switchgear, not a synonym for every metal enclosure. Its construction uses grounded metal barriers to separate major primary components; drawout circuit breakers and shutters for primary disconnects are characteristic features. Identify the specified standard, such as IEEE C37.20.2 where applicable, and verify the proposed construction against project requirements.

Compartmentation supports an organized approach to isolation and maintenance, but it does not make energized access safe or automatically confer an arc-resistant designation. A drawout arrangement can add space and expense compared with a simpler alternative. Evaluate the required breaker handling area, maintenance strategy and verified construction features rather than judging the lineup by its exterior alone.

Establish the electrical duty before sizing

Provide a current one-line diagram showing each source, transformer, main, tie and feeder, together with system voltage, frequency and grounding method. Include present loads, anticipated expansion and the required continuous current for each circuit. The equipment voltage class, insulation level and bus ratings must be evaluated for the actual system and installation conditions.

Ask the utility or study engineer for available fault-current information at the intended connection, including source assumptions. Breaker interrupting capability, the assembly’s momentary and short-time withstand duties, and protection clearing times must be evaluated together. A feeder current alone cannot establish fault duty; if the source configuration changes, the engineer should revisit the study and equipment selection.

Define protection and operating interfaces

For a two-source lineup, describe whether the sources may operate in parallel, when a tie is intended to close and what conditions must prevent an unintended connection. The engineer can translate that operating philosophy into protective relays, mechanical or electrical interlocks, indications and control logic. Document the intended states and exceptions for owner review.

Specify current and voltage transformer inputs, relay functions, control power supply, trip circuits and any remote monitoring points. A protection study should establish settings and coordination with upstream and downstream devices; identify who supplies the study and who applies and verifies settings. Also define the expected response to loss of control power instead of assuming every device behaves alike.

Fit the lineup to its actual site

Share the equipment room or outdoor location, ambient conditions, altitude, exposure to moisture or corrosive contaminants, and the desired enclosure arrangement. Indoor space constraints and outdoor weather protection affect ventilation, condensation control and maintenance access. Confirm the applicable enclosure features and any environmental effects on ratings with the manufacturer during engineering review.

Show cable entry direction, conductor quantities and termination details, plus transformer, grounding and control-cable interfaces. Room drawings should accommodate code-required working space, door openings and breaker handling. Agree on shipping splits, section weights, lifting provisions, foundation and anchorage responsibilities so the contractor can plan delivery and installation without discovering a blocked route late in the project.

Review evidence, not just a product label

The quotation and submittal should identify the applicable equipment standard, proposed ratings, protection devices, enclosure features and any exceptions. Request a one-line, elevations, connection details, control schematics and a device schedule. Verify the specific assembly’s qualification, listing or certification requirements with the manufacturer and the authority having jurisdiction; do not assume a low-voltage switchboard listing applies to this equipment.

Define factory inspection and test scope in advance, including appropriate mechanical checks, dielectric tests and control-function verification, with agreed acceptance criteria and records. If witnessing is important, place it in the purchase documents. At turnover, request final drawings, device instructions and relevant test reports, and distinguish factory results from field acceptance testing and site commissioning.

Make the purchase and schedule actionable

An effective request for quotation pairs the one-line and duty data with specifications, site drawings, delivery destination, documentation expectations and required review milestones. Identify any required US-made components individually and ask for sourcing and availability confirmation. Compare proposals on the same construction, testing and interface scope; a lower initial figure may omit engineering or field work another proposal includes.

Reserve time for design clarification, submittal approval, component procurement, manufacturing, inspection, shipment and installation. Actual timing depends on approved scope and component availability, so coordinate the plan rather than assuming a fixed delivery date. The owner and contractor should assign installation, field testing and energization to qualified personnel under site procedures, applicable codes and manufacturer instructions.

LET'S BUILD SOMETHING RELIABLE — 03

Ready to talk
switchgear?

Tell us about the new equipment your project needs. Include as much or as little detail as you have today.

(951) 403-5738

CALL TO DISCUSS YOUR PROJECT

PROJECT INQUIRY

Request a quote

01 — 04

This opens your email app for you to review and send. Add any details that do not transfer, or call if you do not have an email app configured.

Request a quote