BUILT IN THE USA. READY FOR YOUR PROJECT.
Pad-Mounted Switchgear for Airports
An airport’s outdoor distribution network connects loads with very different operating priorities: terminal systems, airfield lighting, navigation facilities and support buildings.
DIRECT FROM THE MANUFACTURER / NEW EQUIPMENT

THE MANUFACTURER’S PERSPECTIVE — 02
An airport’s outdoor distribution network connects loads with very different operating priorities: terminal systems, airfield lighting, navigation facilities and support buildings. New pad-mounted switchgear can provide switching and feeder organization where underground circuits meet, but its role must be defined within the airport’s actual power system. Owners and specifiers should develop the electrical design and construction plan together, rather than choosing an enclosure by footprint alone.
Place the assembly in the airport network
Start with a current one-line diagram showing utility supply, transformers, switching points, feeder destinations and ownership boundaries. Identify which circuits serve terminals and which supply airfield systems, including any intermediate transformers or lighting controls. This context determines whether the proposed equipment is intended to sectionalize a feeder, distribute multiple circuits or provide another specifically engineered function.
A radial arrangement may be simpler to document, while a loop or alternate-feed arrangement can offer different restoration options. The latter also introduces more operating states, protection and interlocking questions. Do not assume that a loop automatically restores service or permits sources to operate in parallel; those functions require a defined design and approvals.
Define electrical duties before selecting devices
Provide nominal system voltage and configuration, continuous load and projected growth, available fault current at the location, and the utility or engineer’s operating assumptions. The manufacturer and project engineer can then review equipment voltage class, continuous and short-circuit duties, insulation, bus and terminations. Ratings and suitability must be verified for the proposed assembly rather than inferred from its appearance.
Different switching devices perform different jobs. A load-interrupting switch is not necessarily intended to interrupt every available fault; fuses or other protective devices may be needed as part of the engineered scheme. Submit transformer characteristics and upstream and downstream protection data so the responsible engineer can assess coordination, fault clearing and the effect of feeder switching.
Coordinate standby power and control boundaries
Show generator connections, transfer equipment and any alternate utility source on the one-line, even when they are outside the pad-mounted assembly. Identify which loads must remain supplied, who controls transfer, and which source combinations are permitted. A switch position alone does not establish a complete standby-power scheme or prevent an unintended backfeed.
Define interlocks, status indications, control-power dependencies and any remote monitoring points with the airport’s controls and protection teams. The engineer should review generator fault contribution, grounding and protective settings for each operating state. If the project calls for automatic transfer, specify the sequence and failure response and identify the party responsible for testing the complete interface.
Fit the pad to airfield and site constraints
Confirm the proposed location with airport operations, the electrical designer and the civil team before fixing the equipment layout. Access routes, security boundaries, visibility, aircraft and vehicle movement, underground utilities and applicable airfield restrictions can affect placement. Coordinate the pad elevation and drainage with the site’s flood assessment; avoid assuming that an outdoor enclosure alone resolves water exposure.
Share duct-bank routing, conduit entry locations, conductor sizes and quantities, cable bending and termination requirements, and expected ground connections. The civil and structural designers need equipment dimensions, operating and maintenance access, shipping weights and anchorage information. Consider heat, condensation, dust, deicing chemicals and corrosion exposure when specifying enclosure construction and any environmental controls.
Phase work around operational windows
Map each feeder to its affected airport functions and agree on which stakeholders must approve an interruption. The owner’s construction team can use that map to sequence civil work, equipment delivery, cable installation and cutover around acceptable outage windows. Coordinate any temporary supply separately, including its capacity, connection points, protection and effect on critical loads.
A useful schedule includes design review, utility and airport approvals, component procurement, fabrication, inspection, shipping and commissioning, with time for resolved comments. Identify dependencies rather than treating a quote date as a delivery promise. Qualified personnel must plan isolation, testing and energization under applicable site safety procedures, with an approved contingency and restoration plan.
Buy on a clear scope and submittal package
For a direct-manufacturer quotation, send the one-line, specifications, site constraints, feeder schedule, required operating states and anticipated procurement milestones. State applicable standards, required listing or certification evidence, witness-test expectations and any component-origin requirements. Ask the manufacturer to confirm feasibility, actual sourcing and availability, and to identify deviations rather than leaving them implicit.
Compare proposals on switching and protection functions, enclosure details, cable interfaces, documentation and the division of field responsibilities, not just the equipment total. Request approval drawings, device schedules, control schematics and agreed factory test records, followed by final documentation for the installed configuration. Assign responsibility for settings, field acceptance and coordination with the airport and utility.
LET'S BUILD SOMETHING RELIABLE — 03
Ready to talk
switchgear?
Tell us about the new equipment your project needs. Include as much or as little detail as you have today.
(951) 403-5738CALL TO DISCUSS YOUR PROJECT