Electrical Panelboards for Commercial Buildings
A commercial building’s panelboards distribute power to the branch circuits serving tenants, shared spaces and building systems.
DIRECT FROM THE MANUFACTURER / NEW EQUIPMENT

THE MANUFACTURER’S PERSPECTIVE — 02
A commercial building’s panelboards distribute power to the branch circuits serving tenants, shared spaces and building systems. Their arrangement affects who can meter loads, how easily a space can change occupants and when electrical work can be scheduled. Owners and specifiers can obtain a more useful proposal for new equipment by defining these relationships before settling on a panel count or location.
Map tenant and building loads
Start with a one-line diagram and a load schedule that identify the service, distribution equipment, panelboards and intended circuit destinations. Separate tenant lighting and receptacles from common-area loads and central equipment. Note whether a tenant’s air conditioning is individually served or shared; that distinction affects feeder boundaries and the usefulness of tenant-level metering.
For each panel, provide the system voltage, phase and wire arrangement, calculated demand, circuit quantities and expected occupancy changes. Include unusual or nonlinear loads and any known future fit-out requirements. The design engineer should establish demand assumptions rather than treating the sum of all branch breaker handles as the building’s actual load.
Coordinate the service and meters
A panelboard may be downstream of a service switchboard or other distribution equipment; it is not automatically the service equipment. Show the point where the utility’s scope ends and the customer’s distribution begins, including the proposed service disconnect arrangement. The utility and design team must confirm their respective requirements before the equipment layout is finalized.
Distinguish utility revenue meters from customer submeters used for tenant allocation or building management. Identify who supplies each meter, current-sensing components, communications and any required enclosures, as well as who approves their locations. A convenient submeter does not substitute for a utility-approved revenue metering arrangement; applicable local rules and the utility’s requirements govern that interface.
Balance protection with room to grow
Provide available fault-current information at the proposed installation points and the upstream protective device details. The engineer must check the complete panelboard assembly and its devices against system voltage, continuous current and short-circuit duty, including any specified series combination. Device interrupting ratings alone do not establish the adequacy of the entire assembly.
Spare circuit positions can make a later tenant fit-out easier, but open spaces do not create feeder or bus capacity. Reserve physical positions and electrical capacity deliberately, and identify whether spare breakers are included. Where service continuity matters, a coordination study can compare protective-device characteristics; complete selectivity should not be assumed without analysis across the relevant fault range.
Fit the distribution to occupied space
Panel locations influence feeder length, voltage drop, access and tenant disruption. A central electrical room can simplify oversight, while panels nearer the loads may reduce long branch runs but require access agreements within leased areas. Compare the options with the actual floor plan, routing constraints and maintenance responsibilities rather than choosing solely by first cost.
Share room dimensions, access paths, enclosure environment and preferred cable entry with the manufacturer and installer. The design team must verify applicable working spaces, egress, heat and other code requirements for the actual equipment and site. Coordinate panel access with doors, tenant improvements and stored materials so the intended clear space remains available after occupancy.
Build a comparable request for quotation
Send the direct manufacturer the current one-line, panel schedules, available fault data, feeder and conductor information, mounting preferences and construction schedule. Specify labeling, metering interfaces and the required equipment standard or listing, then verify that the proposed panelboard and its particular configuration meet the project’s requirements. Identify the approving authority and any utility review needed.
Ask each proposal to distinguish the new panelboards from upstream equipment, field wiring, meters, installation and commissioning. Compare device types, circuit spaces, enclosure construction, submittals and exceptions as well as price. Where a component or arrangement is proposed as an alternate, have the engineer evaluate its electrical and physical fit before approving the change.
Plan approvals, delivery and turnover
Set dates for design release, shop-drawing review, utility decisions and component approvals before coordinating fabrication and delivery. Tenant changes after approval can alter panel schedules or feeder connections, so track revisions and their schedule effects explicitly. For an occupied building, the owner and contractor should coordinate permitted outage windows, tenant notices and temporary power needs separately from equipment delivery.
Request reviewed drawings, circuit directories, equipment instructions and agreed inspection or test records for turnover. Confirm who updates the final circuit identification after field changes and who supplies protective-device settings and study results. Installation, testing and energization belong to appropriately qualified personnel working under the project’s safety procedures and authority requirements.