Automatic Transfer Switches for Commercial Buildings

An automatic transfer switch (ATS) connects selected building loads to an alternate source when normal power is unavailable, then returns them when normal service is suitable.

DIRECT FROM THE MANUFACTURER / NEW EQUIPMENT

Row of Allen-Bradley electrical control cabinets with black handles.
01 / POWER DISTRIBUTIONBUILT FOR THE JOB
Representative switchgear photography.
✦MADE IN THE USAAmerican components
▦UL 891Switchboards when specified
↗BUILT TO SPECProject-specific engineering
→NATIONWIDEShipping across the USA

THE MANUFACTURER’S PERSPECTIVE — 02

An automatic transfer switch (ATS) connects selected building loads to an alternate source when normal power is unavailable, then returns them when normal service is suitable. For a commercial building, the important decision is not merely which switch to buy: owners and engineers must decide which occupants and systems need continuity, how much alternate power exists, and where the transfer equipment belongs in the distribution system.

Choose the loads before sizing the switch

Start with a one-line diagram showing the utility service, distribution equipment, tenant feeders, generator or other alternate source, and proposed ATS location. A load schedule should distinguish required emergency or legally required standby loads, where applicable, from optional standby loads. Egress lighting, fire protection systems, elevators, ventilation and tenant operations can have very different continuity requirements.

The engineer should review demand, motor starting, future tenant improvements and the alternate source's usable capacity, not simply add every connected nameplate. One switch serving a large group may simplify the physical layout, while separate transfer paths can support different priorities and code requirements. More paths also mean additional equipment, controls and coordination.

Define both sources and the transfer sequence

Provide the nominal voltage, phase and wire configuration, source capacity and grounding arrangement for both supplies. The ATS must be suitable for the actual system and load; neutral switching, if needed, depends on the source configuration and grounding design. The engineer should resolve that interface with the generator supplier rather than assume every project uses the same arrangement.

Most projects should explicitly describe normal-source sensing, generator start signals, source-acceptance criteria, transfer and return delays, and the response if a source fails during transfer. Open-transition switching briefly interrupts the load. A closed-transition arrangement may reduce that interruption, but adds synchronizing and interconnection considerations and requires confirmation of utility and equipment permissions.

Coordinate protection and service equipment

An ATS is not a substitute for every upstream protective device. Give the manufacturer available fault-current information at the proposed location for each source and the relevant protective-device characteristics. The engineer must check the switch's applicable withstand and closing rating against the specified protection and fault conditions; continuous current alone does not establish short-circuit suitability.

If transfer equipment will also perform a service-entrance function, identify that requirement early and verify the actual configuration, disconnecting means and applicable approvals. Coordinate the utility's service rules with the authority having jurisdiction. Applicable transfer-switch listing and labeling should be verified for the specific assembly and installation, rather than inferred from a switchboard specification.

Keep tenant circuits and meters intelligible

A shared standby source can support selected landlord and tenant circuits, but its boundaries must be visible on the one-line and feeder schedule. Identify which panels remain on normal power only, which transfer, and who may authorize changes to tenant loads. This prevents a later fit-out from quietly consuming capacity reserved for building safety or common areas.

Meter placement changes what consumption is measured during alternate-source operation. Distinguish utility revenue metering from owner submeters and building-management monitoring, and coordinate required meter locations and instrument-transformer spaces with the utility and design team. If tenant billing includes generator operation, the owner should define the intended measurement and allocation method before equipment drawings are finalized.

Plan the room around an occupied building

Document the electrical-room dimensions, access route, enclosure environment, cable entry, termination details, ventilation and required working space. The contractor should check delivery and rigging constraints as well as the equipment footprint. A bypass-isolation arrangement, when appropriate and available, can support maintenance flexibility, but it adds space and complexity and still requires an engineered operating plan.

For an occupied property, agree on access restrictions, tenant notifications and permitted outage windows before committing to a sequence. The owner and contractor should evaluate any temporary power needs separately, including source capacity and connection interfaces. Planned building work must follow the site's safety procedures and be carried out by qualified personnel.

Buy against a defined scope and acceptance plan

A useful request to a direct manufacturer includes the one-line, load schedule, source and fault data, desired transfer sequence, enclosure conditions, metering needs and project schedule. Identify interfaces for generator controls, alarms and building-management systems, including point lists and communication responsibilities. Confirm component availability and any specified origin requirements rather than assuming a particular source.

Compare proposals for drawings, dimensions, ratings, listing scope, factory checks, exceptions and responsibilities for field wiring, settings and commissioning. Allow time for submittal review, utility coordination, component procurement and site readiness; dates depend on the approved scope. Qualified personnel should verify the agreed sequence and document results before the owner accepts the installation in San Antonio, South Texas or elsewhere nationwide.

LET'S BUILD SOMETHING RELIABLE — 03

Ready to talk
switchgear?

Tell us about the new equipment your project needs. Include as much or as little detail as you have today.

(951) 403-5738

CALL TO DISCUSS YOUR PROJECT

PROJECT INQUIRY

Request a quote

01 — 04

This opens your email app for you to review and send. Add any details that do not transfer, or call if you do not have an email app configured.

Request a quote