27 kV Switchgear: Application and Load Planning

A 27 kV project begins with a system definition, not a catalog label.

DIRECT FROM THE MANUFACTURER / NEW EQUIPMENT

Row of Allen-Bradley electrical control cabinets with black handles.
01 / POWER DISTRIBUTIONBUILT FOR THE JOB
Representative switchgear photography.
✦MADE IN THE USAAmerican components
▦UL 891Switchboards when specified
↗BUILT TO SPECProject-specific engineering
→NATIONWIDEShipping across the USA

THE MANUFACTURER’S PERSPECTIVE — 02

A 27 kV project begins with a system definition, not a catalog label. Owners, electrical engineers and contractors need to establish how the supply, feeder loads and operating scenarios fit together before selecting a new switchgear assembly. The nominal system voltage, the highest voltage the equipment must withstand in service and the equipment voltage class are related, but they are not interchangeable.

Clarify what 27 kV describes

Ask the utility or system designer whether 27 kV identifies a nominal line-to-line system voltage, an equipment maximum voltage rating or another specification. Obtain the expected operating voltage range, frequency, phase arrangement and grounding method. The engineer compares the maximum service voltage with the ratings of the complete assembly and its individual components, rather than selecting on a shorthand label.

Insulation selection also depends on temporary and switching overvoltages, lightning exposure, grounding and the required dielectric and impulse withstand levels. Surge protection and equipment insulation should be coordinated as an engineered system. Altitude, contamination and moisture may change the design requirements or the applicable manufacturer limits; they cannot be resolved by choosing a voltage class alone.

Connect source arrangements to the loads

Start the one-line with each utility, generator or other source and show transformer connections, primary feeders, bus sections and intended loads. A facility may use medium-voltage feeders to serve transformer primaries, with downstream loads operating at different voltages. Record transformer capacities and impedances, feeder destinations and any large motors or other loads connected directly to the system.

A single source may suit a simple distribution arrangement, while two sources and a bus tie may support continuity objectives. The latter adds equipment, control and protection complexity. Identify permitted source combinations, whether paralleling is allowed and which loads must remain supplied during an outage. The engineer can then evaluate both normal operation and credible alternate configurations.

Size for demand, starting and growth

Provide a load schedule with present demand, anticipated additions and the basis for diversity, rather than adding nameplate values without context. Include voltage, phase, load type and duty cycle for each feeder. Transformer loading, motor starting current and simultaneous process starts can affect feeder capacity and voltage performance even when average demand appears modest.

The engineer translates the load and source data into continuous-current requirements for the bus, incoming devices and individual feeders, accounting for equipment and environmental limits. Future feeders need more than empty panel space: the bus, protection, physical compartment and terminations must support the planned duty. Extra capacity provides flexibility but can increase footprint and initial cost.

Match protection to each operating case

Request source fault data from the utility and identify contributions from transformers, generators and motors as applicable. The available fault current may change with the bus tie position or future source additions. The responsible engineer compares these cases with the assembly withstand and the interrupting and close-and-latch duties of the selected switching devices, as applicable.

Protection choices also depend on grounding and coordination with devices upstream and downstream. Define current and voltage transformer functions, ratios and accuracy needs, relay inputs, trip power and communications interfaces. A coordination study establishes proposed settings and documents limitations; assigning the study, settings approval and field verification explicitly helps prevent gaps between the equipment package and the installation.

Resolve medium-voltage physical interfaces

Cable entry, termination space and insulation clearances can drive the lineup dimensions. Supply conductor type, size, quantity, insulation details, shielding and entry direction, together with the termination system proposed by the installer. The manufacturer and engineer should review the connection design and responsibility for cable supports, stress-control components, grounding and field terminations.

Indoor and outdoor locations pose different exposure and access questions. Document ambient conditions, ventilation, condensation, seismic criteria where applicable, shipping access and the room or pad layout. A more compact arrangement can reduce building space but may constrain cable installation and maintenance access. Qualified personnel and the applicable codes determine required working clearances and site procedures.

Buy against a defined engineering package

For a useful proposal, send the latest one-line, load schedule, utility information, fault study assumptions, site constraints and required standards. Ask the direct manufacturer to identify proposed assembly construction, voltage and current ratings, protection scope, deviations and availability for the application. Confirm project-specific listing or certification requirements with the manufacturer and authority having jurisdiction; do not assume a switchboard listing applies to medium-voltage switchgear.

Set milestones for engineering review, approved drawings, component procurement, fabrication, factory checks and delivery. Clarify who supplies cables, relay settings, site testing and commissioning, and request drawings, device schedules, test records and manuals as agreed deliverables. Changes to source data or operating modes can affect design and schedule. Installation, testing and energization belong to qualified personnel under the owner’s approved safety plan.

LET'S BUILD SOMETHING RELIABLE — 03

Ready to talk
switchgear?

Tell us about the new equipment your project needs. Include as much or as little detail as you have today.

(951) 403-5738

CALL TO DISCUSS YOUR PROJECT

PROJECT INQUIRY

Request a quote

01 — 04

This opens your email app for you to review and send. Add any details that do not transfer, or call if you do not have an email app configured.

Request a quote