35 kV Switchgear: Application and Load Planning

A 35 kV system can serve a large site, a campus distribution network, or an industrial feeder, but that nominal voltage alone does not define a switchgear lineup.

DIRECT FROM THE MANUFACTURER / NEW EQUIPMENT

Gray electrical switchgear cabinets with open doors on wooden pallets.
01 / POWER DISTRIBUTIONBUILT FOR THE JOB
Representative switchgear photography.
✦MADE IN THE USAAmerican components
▦UL 891Switchboards when specified
↗BUILT TO SPECProject-specific engineering
→NATIONWIDEShipping across the USA

THE MANUFACTURER’S PERSPECTIVE — 02

A 35 kV system can serve a large site, a campus distribution network, or an industrial feeder, but that nominal voltage alone does not define a switchgear lineup. Owners and engineers need to connect the source configuration, expected loads, protection strategy, and physical installation to an equipment specification. Early coordination with a direct manufacturer helps turn those inputs into a practical request for a newly built assembly.

Translate nominal voltage into equipment requirements

Nominal system voltage describes the system, not necessarily the maximum voltage rating printed on an assembly. Provide the utility or system designer's nominal and maximum operating voltages, frequency, phase arrangement, and grounding method. The equipment voltage class must accommodate the actual system conditions; do not select it solely by matching the words 35 kV in a catalog.

Ask the engineer to identify insulation requirements, including applicable power-frequency and impulse withstand levels, and any exposure to switching or lightning surges. Grounding and expected overvoltages can influence that review. Confirm the ratings and construction of the complete proposed assembly and its components; availability at the required class must be established for the particular project.

Map sources and operating states

The one-line diagram should show utility connections, transformers, incoming circuits, buses, feeder destinations, and any generation or alternate sources. Identify whether a tie is normally open or closed and whether sources may operate in parallel. A second source can change fault contribution and protection requirements even when the ordinary load on each feeder is unchanged.

Describe the desired continuity of service and the maintenance boundaries as operating objectives, not just breaker counts. A sectionalized arrangement may limit the area affected by an outage, but it also adds equipment, controls, space, and coordination work. Define interlocks and transfer permissions with the owner, utility, and design engineer before requesting a firm scope.

Build a load schedule that supports growth

List each feeder's present and planned demand, connected loads, voltage, load type, and expected operating pattern. Distinguish transformer demand from the lower-voltage loads it supplies, and identify motors or other loads with significant starting or transient demand. For balanced three-phase loads, the engineer can relate apparent power and line-to-line voltage to current; power factor matters when starting with real power.

Coincidence matters: adding every equipment nameplate as if all loads peak together can distort the expected operating case. Conversely, leaving out a future process or expansion can make the bus or feeder allocation inadequate. Show the demand assumptions, spare circuit positions, and anticipated growth separately so the manufacturer can review continuous-current requirements without treating spare space as guaranteed capacity.

Coordinate fault duty and protective functions

Obtain available fault information from the utility and account for contributions from generators, motors, and other connected sources in each credible operating state. The engineer must compare calculated duty with the proposed assembly and devices, including interrupting, closing, and withstand duties as applicable. A continuous-current rating alone says nothing conclusive about fault capability.

Document required relay functions, current and voltage transformer interfaces, control power, trip circuits, and communication signals. A coordination study may favor different device characteristics or clearing times than an equipment-only selection would suggest. Assign the protection engineer responsibility for study assumptions and approved settings, and define who supplies and tests the associated controls.

Plan insulation, terminations, and site interfaces

Share cable sizes, quantities, insulation and shielding details, entry direction, and termination requirements early. Medium-voltage termination space and bend routing can drive section dimensions and installation access. The design team should also coordinate the grounding connection, any surge protection, and transformer or overhead-to-cable interfaces rather than assuming those items are included in the lineup.

Specify indoor or outdoor exposure, ambient temperature, altitude, humidity, ventilation, and room or pad constraints. These conditions can affect insulation performance, thermal capacity, enclosure construction, and access. Compare footprint and maintainability alongside electrical capability, and confirm project-specific equipment ratings and any environmental limitations in the proposed documentation.

Turn the design into a purchase and delivery plan

Send the manufacturer the current one-line, load schedule, source and fault data, equipment standard or listing requirements, site constraints, and a requested scope boundary. Ask for a proposal that identifies ratings, included devices, exceptions, drawings, inspection or test records, and assumptions. Verify applicable standards and any required listing for the specific assembly, rather than applying a low-voltage switchboard standard by default.

Schedule time for engineering questions, submittal approval, component procurement, fabrication, agreed factory testing, shipping, installation, and commissioning. Changes to source data or cable interfaces after approval can affect both design and schedule. The owner should coordinate utility approvals and site access; qualified electrical personnel must plan and perform field work and commissioning under applicable procedures.

LET'S BUILD SOMETHING RELIABLE — 03

Ready to talk
switchgear?

Tell us about the new equipment your project needs. Include as much or as little detail as you have today.