27 kV Switchgear: Procurement and Submittal Checklist

A purchase request for a 27 kV system should do more than name a voltage.

DIRECT FROM THE MANUFACTURER / NEW EQUIPMENT

Electrical switchgear beside loose conduit and fittings on a workshop floor.
01 / POWER DISTRIBUTIONBUILT FOR THE JOB
Representative switchgear photography.
✦MADE IN THE USAAmerican components
▦UL 891Switchboards when specified
↗BUILT TO SPECProject-specific engineering
→NATIONWIDEShipping across the USA

THE MANUFACTURER’S PERSPECTIVE — 02

A purchase request for a 27 kV system should do more than name a voltage. The engineer, owner, and contractor need a common record of the supply, duty, interfaces, and review responsibilities before a manufacturer can evaluate a new assembly. Use the checklist below to make the quotation comparable and the later submittal useful; equipment availability and final selection remain subject to project-specific engineering.

Start with the system and its sources

Send a current one-line diagram showing utility and alternate sources, transformers, switching devices, bus arrangement, feeder destinations, and normal operating states. Identify the nominal system voltage, phase configuration, frequency, grounding method, and highest anticipated operating voltage. Note whether sources may operate in parallel, because that assumption changes the fault duty the assembly must address.

Attach a load and feeder schedule with present demand, expected growth, continuous current requirements, conductor quantities, and important motor or transformer loads. Distinguish planned capacity from committed loads. Mark information that is provisional and name the engineer responsible for resolving it, so a quote does not quietly treat a preliminary estimate as a final design.

Verify the voltage class and insulation basis

Ask the manufacturer to confirm the proposed equipment maximum voltage against the actual system conditions, not merely repeat the 27 kV label. A nominal system voltage and an equipment maximum voltage are different quantities; a class with the same number may not be suitable. The project engineer should establish the required class and confirm availability before the purchase is committed.

Specify the applicable insulation withstand and impulse requirements, relevant equipment standard and edition, altitude, and indoor or outdoor exposure. Insulation coordination should consider source conditions, surge protection, connected equipment, and termination interfaces. Higher insulation requirements can affect the assembly configuration and space; request the proposed values and any exceptions rather than assuming them from a catalog description.

Define fault duty and protective functions

Provide the available maximum and minimum fault data at the equipment, source impedances, and the study assumptions, including utility contribution and any alternate source. Identify the required interrupting duty, short-time withstand duration, and momentary duty for the assembly and devices. Where relevant, include the X/R ratio and ask how it affects the proposed device application.

Include the protection philosophy and coordination study requirements: feeder and main functions, ground-fault sensing, transformer protection, and upstream and downstream interfaces. State who supplies the study, relay settings, and final approval. A device with adequate continuous current capacity is not automatically adequate for fault interruption or selective coordination across every operating condition.

Document controls and external connections

List required relay, metering, and instrument-transformer functions, including ratios, accuracy and burden requirements where known. Identify the trip and control power source, voltage, backup expectations, alarms, and behavior on loss of supply. Ask for control schematics and a terminal schedule showing which field wiring lands on the assembly and which equipment supplies each signal.

For remote monitoring or control, provide a preliminary point list, communications protocol, network interface, and division of cybersecurity and commissioning work. Describe interlocks and intended source-transfer states without assuming that a communications link provides a safety function. Have the engineer verify that the protection and control design supports the owner’s operating philosophy.

Resolve the physical and site interfaces

Supply room or site plans, access routes, permissible shipping dimensions, foundation constraints, and cable entry direction. Include cable types, sizes, quantities, shields, and termination requirements so the manufacturer can evaluate space and compatible interfaces. Request general arrangement drawings with weights, lifting provisions, shipping splits, and connection locations; coordinate final clearances with the design team.

State the environmental conditions, enclosure needs, ventilation or heat-management constraints, and any site-specific structural or seismic criteria. Identify responsibility for the foundation, grounding connections, field cable terminations, and assembly of shipping splits. Extra access or future feeder space may enlarge the lineup, so compare those provisions against the actual room and expansion plan.

Make reviews and delivery milestones explicit

Ask for a written scope and exceptions list alongside the quotation, identifying proposed ratings, device functions, major components, applicable standards, and any project-specific listing to be verified. Define the required submittal package: one-line and arrangement drawings, protective-device details, control schematics, bill of materials, test plan, and installation and maintenance documentation as applicable.

Agree on drawing-review periods, comment resolution, procurement release, inspection or witness points, shipping, and document turnover. Component availability and design changes can shift the schedule, so request dated assumptions and a change process rather than relying on an unconfirmed delivery date. Qualified electrical personnel and the project engineer must direct field work, testing, settings, and authorization to energize under applicable site procedures.

LET'S BUILD SOMETHING RELIABLE — 03

Ready to talk
switchgear?

Tell us about the new equipment your project needs. Include as much or as little detail as you have today.

(951) 403-5738

CALL TO DISCUSS YOUR PROJECT

PROJECT INQUIRY

Request a quote

01 — 04

This opens your email app for you to review and send. Add any details that do not transfer, or call if you do not have an email app configured.

Request a quote