BUILT IN THE USA. READY FOR YOUR PROJECT.
Jourdanton Switchgear Manufacturing
A useful switchgear quote starts with a picture of both the electrical system and the space where the equipment must fit.
DIRECT FROM THE MANUFACTURER / NEW EQUIPMENT

THE MANUFACTURER’S PERSPECTIVE — 02
A useful switchgear quote starts with a picture of both the electrical system and the space where the equipment must fit. For a Jourdanton project, owners and contractors can work directly with a U.S. manufacturer of new power-distribution assemblies while the design team assembles these inputs. A marked-up one-line and a dimensioned site sketch often reveal scope questions before they become expensive drawing revisions.
Show how power reaches each load
Begin the one-line at each source and trace the proposed distribution through transformers, main devices, buses and outgoing feeders. Identify the nominal system voltage, phases and wires, including neutral requirements. Label feeder destinations and note which equipment belongs in the requested assembly rather than in a separate panel, transformer or transfer switch.
For example, a facility adding process loads may need both existing destinations and planned feeders shown, with their anticipated demand and operating characteristics. Distinguish a confirmed load from a placeholder. The engineer can then assess whether a spare position, an installed protective device or a larger allowance for expansion is justified.
Add the information behind the symbols
A single-line symbol does not establish an equipment rating. Provide the design current, available fault-current information at the proposed connection, and the source of those values. The engineer and utility may need to confirm service characteristics, transformer data, fault contribution and metering requirements before the manufacturer can evaluate an assembly and its protective devices.
Identify required breaker functions, metering and any generator or other alternate source. If sources connect through transfer or tie equipment, describe intended operating states and interlocks rather than assuming the drawing implies them. A coordination study and protective settings belong with the responsible engineering team unless the purchase scope expressly assigns them elsewhere.
Measure the entire installation envelope
Send a dimensioned plan and elevation showing available width, depth and height, door openings, obstructions and the proposed equipment location. Mark structural columns, overhead services and floor features that affect the footprint. An outdoor installation also needs the proposed pad outline, surrounding access and known exposure conditions documented.
The cabinet footprint is only part of the space decision. Drawings should show door swing, access to terminations and components, and the working and egress space required for the actual design. The project engineer and authority having jurisdiction determine applicable clearance requirements; a tight footprint may require a different arrangement or additional sections.
Connect the room sketch to the one-line
Mark whether source and feeder cables approach from above or below, and locate conduits, cable trays or busway relative to the lineup. List conductor quantities and sizes when known, including neutral and grounding conductors. These details affect termination space and section layout, so an apparently simple feeder can change the physical design.
Also identify delivery routes, doorway limits and rigging restrictions. A lineup may need shipping sections that fit the route, but splits introduce field connection, alignment and inspection responsibilities. Ask the manufacturer for proposed dimensions, weights, lifting provisions and split locations, and coordinate the receiving plan with the installation contractor.
Define the quote and review deliverables
Send the drawing revision, site dimensions, equipment specifications and requested schedule together. Explain indoor or outdoor service, environmental exposure, access preferences and any owner requirements for components or origin. State which information is preliminary so the proposal can identify assumptions and exclusions instead of treating an incomplete design as final.
Request an itemized scope covering the assembly, protective devices, controls, metering interfaces and documentation. Compare quotations for ratings, deviations, factory inspection or testing, shipping and field connection boundaries. Where an appropriate switchboard assembly calls for UL 891, verify the specific proposed listing and its scope rather than assuming it applies to every kind of switchgear.
Plan approvals and the field handoff
Before committing to a fabrication schedule, allow time for utility input where applicable, engineering review of submittals, component availability and resolution of comments. Ask how a change to a feeder, enclosure or cable entry affects drawings and delivery planning. Agree on a revision-controlled approval process and identify who can authorize changes.
At handoff, coordinate installation drawings, connection details, test records and operating documentation with the contractor and owner. Define responsibility for foundations, field wiring, protection studies, commissioning and any outage plan. Qualified personnel must perform electrical work under applicable safety procedures and manufacturer instructions; the owner coordinates site access and authorization for energization.