BUILT IN THE USA. READY FOR YOUR PROJECT.
Motor Control Centers for Oil and Gas
An oil and gas motor control center brings multiple motor starters, protective devices, and control interfaces into a coordinated assembly.
DIRECT FROM THE MANUFACTURER / NEW EQUIPMENT

THE MANUFACTURER’S PERSPECTIVE — 02
An oil and gas motor control center brings multiple motor starters, protective devices, and control interfaces into a coordinated assembly. Pumps, compressors, ventilation equipment, and auxiliary loads can have very different starting and operating requirements. Owners and specifiers should define those differences early so a new lineup fits the electrical system, the process, and the location where personnel will use it.
Build the motor schedule around the process
Start with a current one-line diagram and a motor schedule identifying each load, its nameplate data, operating duty, and normal and emergency operating requirements. Include the source arrangement, system voltage and phase, expected load growth, and available fault current at the proposed lineup. Identify which motors run together and which must remain available during a process upset.
For each load, describe the intended starting method and any acceleration, torque, or voltage-drop concerns. A variable-frequency drive can provide speed control for a process pump, but it introduces heat, harmonic, cable, and motor-compatibility questions that a conventional starter may not. The engineer should compare those effects against the process requirement rather than specify drives everywhere by default.
Resolve classified areas and the enclosure environment
Provide the site hazardous-area classification drawings and any owner requirements before deciding where the lineup belongs. The responsible design team must establish whether the proposed room or outdoor position is classified and what equipment, wiring methods, and interfaces are acceptable there. Moving an assembly to a nonclassified electrical room may simplify equipment selection, but it changes cable routes and building interfaces.
Describe ambient temperature, humidity, condensation, dust, washdown, corrosive chemicals, and any salt exposure at the actual location. Enclosure selection involves a tradeoff: limiting contaminant entry can complicate heat removal. Coordinate ventilation, space heaters if needed, enclosure construction, and environmental protection with the electrical and building designers rather than assuming an indoor rating solves every exposure.
Coordinate protection without treating every feeder alike
Motor branch protection, overload protection, and the upstream feeder device have different roles. Supply the available fault-current information and upstream device characteristics so the engineer and manufacturer can evaluate the proposed assembly and components together. Verify the completed assembly short-circuit rating and device interrupting duties against the system study and the specified operating configurations.
The owner should identify critical motors and the consequences of losing a common bus or adjacent feeder. A coordination study can compare protective-device characteristics across relevant fault levels, but selectivity depends on the actual devices and settings. Reserve space or separate groups where justified; added compartments, devices, and spare capacity increase footprint and procurement scope.
Define control and safety-system boundaries
Document whether each motor is controlled locally, by a programmable controller, or from a distributed control system. A point list should identify commands, running and fault indications, analog signals, control voltage, communication protocol, and the party supplying each network connection. Decide who owns programming and how remote indications will be verified during commissioning.
Process shutdown signals and restart behavior deserve particular attention where an unexpected motor start could affect personnel or equipment. The process safety team must specify permissives, shutdown interfaces, loss-of-power behavior, and any independent safety functions. The MCC design and control-system design should be reviewed together; an ordinary communication link should not be assumed to satisfy a required safety function.
Plan access, cable routes, and installation scope
Give the manufacturer room dimensions, access routes, proposed cable entry, conductor quantities, and available space for terminations. Show obstructions, door swings, and the working clearances required by the applicable code. A compact lineup may reduce floor area while making cable pulling, component access, or later expansion more difficult; review elevations and connection details before approving the layout.
Agree on shipping sections, lifting provisions, foundation and anchorage interfaces, and who completes field interconnections. For a new lineup serving an operating facility, the owner and contractor should coordinate outage windows, temporary supply requirements, and affected process loads. Electrical installation, isolation, testing, and energization belong to qualified personnel following site procedures and applicable requirements.
Buy against documented deliverables and review milestones
Request a proposal for the new assembly directly from the manufacturer with the load schedule, drawings, environmental conditions, control requirements, applicable standards, and requested spare provisions. Compare quotations by included starters, drives, protection, testing, documentation, and stated exceptions rather than by the lineup description alone. If domestic component sourcing is required, specify the requirement and confirm actual availability and origin.
Set milestones for drawing review, component approval, fabrication, factory checks, shipment, and site acceptance. Agree on test scope, witness arrangements, acceptance criteria, and the handoff of drawings, manuals, device information, and test records. Lead time depends on approved information and component availability, so track revisions and unresolved interfaces as schedule risks instead of treating an early estimate as a guarantee.
LET'S BUILD SOMETHING RELIABLE — 03
Ready to talk
switchgear?
Tell us about the new equipment your project needs. Include as much or as little detail as you have today.
(951) 403-5738CALL TO DISCUSS YOUR PROJECT