Mechanical Interlocks for Switchgear
A mechanical interlock makes a permitted equipment state or access sequence depend on a physical condition, rather than relying only on an operator remembering the order.
DIRECT FROM THE MANUFACTURER / NEW EQUIPMENT

THE MANUFACTURER’S PERSPECTIVE — 02
A mechanical interlock makes a permitted equipment state or access sequence depend on a physical condition, rather than relying only on an operator remembering the order. For engineers, contractors and owners specifying new switchgear, the important purchase is not simply a lock or key: it is a documented arrangement that fits the sources, devices, access points and operating philosophy of the facility.
Start with the states that matter
Identify each source, switching device, tie and accessible compartment on the project one-line. Define the combinations that are allowed, prohibited or allowed only under special conditions. For a main-tie-main arrangement, the design may prohibit closing all three devices together to prevent unintended source paralleling, while permitting other combinations chosen by the engineer.
A device-to-device mechanical interlock can restrict movement between nearby mechanisms; a trapped-key scheme can coordinate separated devices or access points. Neither approach automatically solves every switching scenario. Specify the intended states and transitions first, then verify that the selected mechanisms, device arrangements and mounting provisions can enforce them.
Map the key exchange and access sequence
A trapped-key system releases or retains a key in response to a defined mechanical state. An exchange unit can convert one permission into several controlled keys, or require multiple keys before releasing another. Show each key, lock and exchange point on a sequence drawing, including which key is trapped or available in each state.
For compartment access, define the conditions that must be represented before access can be released, including all relevant supply paths and any separately engineered grounding provisions. A key position is not proof that conductors are de-energized. Qualified personnel must follow the site isolation, lockout and verification procedures; interlocking does not replace them.
Specify limitations and failure behavior
State what should happen if a key is lost, a mechanism is damaged or a device cannot reach the position needed for key release. Ask the manufacturer to identify whether the resulting condition blocks the next intended action, and whether recovery requires an approved, controlled process. Avoid describing a scheme as fail-safe without examining its actual failure modes.
Mechanical restraint cannot detect every electrical condition. For example, an open switching device is not necessarily an adequate isolation point, and residual or backfed energy may remain. Any required delay, stored-energy controls or additional permissives need a project-specific design; do not assume a physical interlock provides them.
Coordinate the physical and control interfaces
Confirm whether the interlock responds to an open, closed, disconnected or other device position, and whether that position is suitable for the intended restriction. Device type, handle travel, door hardware and available mounting space affect compatibility. Show the assembly boundaries and any field-installed lock points so interface responsibility is explicit.
Electrical permissives, position indications and remote controls may complement mechanical restrictions, but their signals do not automatically represent the same condition as a key mechanism. The engineer should reconcile the control logic with the mechanical sequence and document behavior when control power is lost, a position indication disagrees or an operator requests an unavailable state.
Turn the sequence into a clear purchase scope
Provide the manufacturer with the current one-line, a written operating philosophy, equipment layout and access requirements. Include source ownership, required device positions, applicable project standards and the locations of equipment outside the new assembly. Identify who supplies remote locks, exchange hardware and any electrical interfaces, rather than leaving those items to assumption.
Request a lock and key schedule, state or sequence diagram, equipment elevations, device interface details and a list of proposal exceptions. Specify key identification, custody, duplicate-key restrictions and the owner’s recovery policy. A more elaborate exchange scheme can control more access points, but adds hardware, documentation and coordination demands.
Plan verification, handoff and schedule
Agree on factory functional checks against the approved sequence, including permitted and blocked states, and define witness requirements, acceptance criteria and records. Coordinate verification of remote interfaces and site-installed components separately. Qualified personnel should perform field checks and commissioning under the approved safety plan and equipment instructions.
Sequence approval affects fabrication and procurement because key coding, device accessories and door arrangements may be linked. Allow time for review, resolution of exceptions and changes to connected equipment before committing to a project schedule. At turnover, provide the final key schedule, drawings and operating limitations to the owner for training and controlled key management.